Fermin Industrial Metal Works Inc. (FIMW) played a key role in the mechanical construction of Bacardi’s Combined Heat and Power (CHP) plant in Cataño, Puerto Rico. Completed between 2022 and 2023, the project exemplifies renewable energy integration and circular economy practices, using biogas recovered from Bacardi’s rum distillation process in combination with LPG to power operations.
The plant generates:
FIMW completed the fabrication, assembly, structural supports, inspections, and testing of all mechanical systems, including:
This installation is a benchmark for sustainable industrial energy solutions, aligning with Bacardi’s environmental commitments while enhancing energy reliability, efficiency, and production continuity.
Fermin Industrial Metal Works Inc. (FIMW) led the mechanical installation of the cogeneration (CHP) plant at Janssen Ortho, LLC in Gurabo, Puerto Rico. The facility features two Rolls-Royce KEe natural gas engines (6.75 MW total), supported by an integrated Battery Energy Storage System (2 MW / 1 MWh), and a heat recovery system for both steam and hot water production.
The plant includes:
FIMW completed the fabrication, assembly, structural supports, inspections, and testing of all mechanical systems, including:
Completed between August 2023 and May 2024, this project enhanced energy reliability, sustainability, and operational efficiency for Janssen Ortho’s manufacturing operations in Puerto Rico.
Maintenance Contract with Genera PR Aguirre.
Fermin Industrial Metal Works Inc. provides mechanical maintenance services for Genera PR Aguirre, ensuring the operational efficiency and reliability of its equipment. The scope of
Through this contract, Fermin Industrial Metal Works Inc. ensures the optimal performance of Genera PR Aguirre’s systems, minimizing downtime and maintaining operational standards.
Fermin Industrial Metal Works Inc. (FIMW) led the mechanical installation of the cogeneration (CHP) plant at Kenvue in Las Piedras, Puerto Rico. The facility features two Bergen high-efficiency natural gas engines (6.74 MW total), designed to provide electricity, steam, and hot water for manufacturing operations, while achieving a 44% reduction in carbon footprint and 25% cost savings compared to the previous system.
The plant includes:
FIMW completed the fabrication, assembly, structural supports, inspections, and testing of all mechanical systems, including:
Completed between February and August 2025, this project delivered a clean, reliable, and efficient energy system that strengthens operational resilience at Kenvue’s Las Piedras facility.